2025-06-16

new way to build MVP's and new app ideas. treat as a hackathon and build a MVP with that time period. if i cant build a MVP around that time period just scrap the idea and move onto the next idea.

timeline for the hackathon

  • 30 mins for planning
  • 4 hours to building

if you think time is not enough just cut down all the feature and build the most crucial feature of the app. stick to the timeline. if you are unable to build with in that time period. move to the next idea.